Effect of Construction Delays and the Preventive Role of Concrete Works Optimization: Systematic Literature Review

Resumen

Delays in construction are a widespread global problem, leading to potential cost overruns and legal disputes. Additionally, delays can result in a decline in construction quality and loss of public trust. The aim of this study is to examine the effects of project delays in various regions and the preventive role of optimizing concrete works. Literature review and bibliometric analysis are carried out to determine global research trends. Findings show that optimizing concrete works can provide benefits such as cost savings, time savings, improved quality and safety, and environmental benefits. Optimization of concrete material composition is one of the most examined topics in this field. Based on the findings, construction firms have the potential to attain cost efficiencies while concurrently mitigating carbon emissions.
Herrera, Claudio Díaz (57200793587); Díaz, Emilio Moyano (58418447500)
Bibliometrics and semantics in XXI century Chilean social science journals; [Bibliometría y semântica em revistas de ciências sociales chilenas del siglo XXI]
2023
10.5209/rgid.89226
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85163831993&doi=10.5209%2frgid.89226&partnerID=40&md5=bb91170f872406e2cf2e48f5dbaf538b
Universidad Católica del Maule, Facultad de Ciencias Sociales y Económicas, Departamento de Ciencias Sociales, Escuela de Trabajo Social, Chile; Universidad de Talca, Facultad de Psicología, Campus Talca, Chile
All Open Access; Gold Open Access
Scopus
Artículo obtenido de:
Scopus
0 0 votos
Califica el artículo
Subscribirse
Notificación de