Effect of Construction Delays and the Preventive Role of Concrete Works Optimization: Systematic Literature Review

Resumen

Delays in construction are a widespread global problem, leading to potential cost overruns and legal disputes. Additionally, delays can result in a decline in construction quality and loss of public trust. The aim of this study is to examine the effects of project delays in various regions and the preventive role of optimizing concrete works. Literature review and bibliometric analysis are carried out to determine global research trends. Findings show that optimizing concrete works can provide benefits such as cost savings, time savings, improved quality and safety, and environmental benefits. Optimization of concrete material composition is one of the most examined topics in this field. Based on the findings, construction firms have the potential to attain cost efficiencies while concurrently mitigating carbon emissions.
Yudhistira, Angga T. (57613398500); Satyarno, Iman (56527194000); Nugroho, Arief S.B. (56526502900); Handayani, Tantri N. (57202737775)
Effect of Construction Delays and the Preventive Role of Concrete Works Optimization: Systematic Literature Review
2024
10.18421/TEM132-34
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85196101501&doi=10.18421%2fTEM132-34&partnerID=40&md5=8e20933a90ac7f5ee25ac2c68243a6a8
Departement of Civil and Environmental Engineering, Universitas Gadjah Mada, Indonesia
All Open Access; Gold Open Access
Scopus
Artículo obtenido de:
Scopus
0 0 votos
Califica el artículo
Subscribirse
Notificación de